Effective Planning for a Smooth Startup
Starting up an industrial project can be a complex and challenging process that requires careful planning and execution throughout the entire project lifecycle. By employing robust scope identification and planning methodologies, “late-in-project” changes can be reduced or eliminated, leading to a near-vertical startup. This acceleration of full-capacity operation reduces total time to cash flow and overall project cost while supporting project economics and production volume expectations.
It is paramount that planning for startup occurs throughout the project. Including this mindset and resources in the initial stages of project development and scoping will ensure that the overall scope of work is thoroughly identified. During the process of scope determination, it is likely that many items will be identified, researched, planned, and ultimately changed. At this point in the project, change should be welcomed, particularly if it occurs for the sake of startup and operations. Changes identified in the early stages of a project are inexpensive and quick to carry out compared to the same occurrence late in the project or even during startup.
Starting an industrial project? Early-stage planning is crucial for success
People, Resources, and Operational Readiness
Another essential aspect of the planning process for an industrial project startup is staff recruitment and training. This includes identifying the necessary roles and responsibilities within the plant, developing job descriptions, and recruiting and training personnel to ensure they are equipped to operate the facility safely and efficiently. Involving operations staff in the commissioning process is an excellent way for them to become very familiar with the plant equipment prior to operations. If the owner company has similar facilities elsewhere, having your new operators trained on similar equipment in other company facilities can also be good practice.
Coordination of production-related feedstock, materials, contract labor, and more is dependent on a predictable and well-thought-out plan to be available for the startup. Resources must be well informed of project progress and site logistics to prepare for startup activities.
Ensuring Long-Term Efficiency and Sustainability
Finally, planning also plays a critical role in ensuring that the plant is operated in a sustainable and environmentally responsible manner. This includes developing policies and procedures for waste management, energy efficiency, and emissions reduction and ensuring that these policies are implemented and monitored throughout the life of the plant.
The role of planning in an industrial project startup cannot be overstated. Effective planning is essential for ensuring that the plant is designed, built, and operated to maximize efficiency, productivity, and profitability while also ensuring that it meets all regulatory requirements and industry standards. By investing time and resources in startup planning, companies can set themselves up for long-term success and ensure their plant startup is smooth and successful.
See more on Construction
Find out more about transformation in this sector
See more on Capital Project Excellence
Find out more about improving this business area