Balance the line to takt time rather than to maximum utilization, and attack the bottleneck before anything else. The logic behind balancing and reducing bottlenecks is the same: the slowest step sets the pace of the whole line, so the order of the work matters.
Takt time, cycle time, utilization
Start from takt time
Takt time is the pace that customer demand sets. Cycle time is the time a station takes to complete its work, and it should be close to takt. A cycle time above takt makes the station a bottleneck. A station that produces faster than takt does not speed up the line: it only builds stock in front of the next one.
Why utilization is the wrong target
Keeping every station fully busy sounds efficient, but it piles up stock between stations and hides where the flow actually breaks. A balanced line is one where every station’s cycle time comes close to takt, not one where everyone is busy. Flow comes first, and efficiency follows.
Unsure where your line’s real bottleneck is?
Line balancing and bottleneck steps
To balance a line and cut its bottlenecks, work in this order:
- Set takt time from demand.
- Study the work at each station and compare its cycle time with takt.
- Find the bottleneck: the station that limits the flow most.
- Reduce the bottleneck first. Cut waste at the bottleneck station, then shift any excess tasks to stations with spare time.
- Rebalance the rest so every station’s cycle time comes close to takt.
The bottleneck moves
Each time you solve a bottleneck, the next one appears. That is expected, and it is why line balancing works as a continuous routine, not a one-off project.
Balance to takt, attack the bottleneck first, and repeat.